Within the framework of the 11th Development Plan, “Workshop on Domestic Production in Rail System Vehicles” was held

Within the framework of the 11th Development Plan, “Workshop on Domestic Production in Rail System Vehicles” was held

The 11th Development Plan “Domestic Production in Rail System Vehicles” Workshop was held on 20-21 December 2017. The workshop, hosted by the Ministry of Development, was attended by companies and organizations that are members of ARUS (Anatolian Rail Transportation Systems Cluster), of which we are on the board of directors, as well as various foreign rail system manufacturers, public institutions and academics operating in Turkey.

Production of vehicles such as high-speed trains, electric train sets, electric locomotives, subways, light rail systems and trams in Turkey with original designs and with the highest level of locality, with the “Domestic Production of Rail Vehicles Working Group” Meetings held within the scope of the 11th Development Plan It is aimed to present a roadmap for

During the “Domestic Production Working Group on Rail System Vehicles” Meetings; Production capacities and competencies of domestic companies, the current view of TCDD and its subsidiaries, identification of critical parts and subsystems and examination of the current production situation in our country, examination of R&D projects carried out for Domestic and National Production studies, examination of the global rail system vehicles production industry, Many topics that concern the present and future of our country’s Rail Transportation Systems industry, especially the roadmap and the examination of the strategies of countries that have the ability to produce their own unique rail system vehicles through technology transfer, have been evaluated.