A PHP Error was encountered

Severity: Notice

Message: Undefined index: HTTP_ACCEPT_LANGUAGE

Filename: controllers/Web.php

Line Number: 17

Backtrace:

File: /home/bozankay/bozankaya.com.tr/app/controllers/Web.php
Line: 17
Function: _error_handler

File: /home/bozankay/bozankaya.com.tr/index.php
Line: 315
Function: require_once

History - Bozankaya A.S. – Bozankaya A.Ş. – Meet the Future

HISTORY

BCC&C was established in Salzgitter, Germany as a research and development company.
1989

BCC&C was established in Salzgitter, Germany as a research and development company.

Bozankaya GmbH established. Car body production started.
1997

Bozankaya GmbH established. Car body production started.

Bozankaya A.Ş. decided to continue its investments in Turkey and continued its car body production in Ankara.
2003

Bozankaya A.Ş. decided to continue its investments in Turkey and continued its car body production in Ankara.

A metro chassis and car body production facility was established in Sacramento, USA under the name of Bozankaya LLC.
2005

A metro chassis and car body production facility was established in Sacramento, USA under the name of Bozankaya LLC.

Turkey's and Germany's first electric bus and Turkey's first domestic 25-meter trolleybus are produced.
2013

Turkey's and Germany's first electric bus and Turkey's first domestic 25-meter trolleybus are produced.

A 100,000 m2 production facility was established in Ankara. Our R&D department was granted the title of R&D Center by the Ministry of Industry and Technology.
2015

A 100,000 m2 production facility was established in Ankara. Our R&D department was granted the title of R&D Center by the Ministry of Industry and Technology.

Production of 100 percent low-floor tram started.
2016

Production of 100 percent low-floor tram started.

Turkey's first metro export to Bangkok, the capital of Thailand.
2018

Turkey's first metro export to Bangkok, the capital of Thailand.

100 percent low-floor trams exported to Timisoara and Iasi cities in Romania
2020

100 percent low-floor trams exported to Timisoara and Iasi cities in Romania

The trams in Timișoara, capable of traveling 70 km on battery power without being connected to the catenary network, were awarded by the European Railway Clusters Initiative.
2021

The trams in Timișoara, capable of traveling 70 km on battery power without being connected to the catenary network, were awarded by the European Railway Clusters Initiative.

Turkey's first domestic driverless metro was delivered to Kocaeli.
2023

Turkey's first domestic driverless metro was delivered to Kocaeli.

We continue to shape the future of mobility...
2024

We continue to shape the future of mobility...